Lane Closure- Holmes Road

WHAT

Holmes Road closure-Eastbound and Westbound direction.

WHEN

Saturday, June 3rd at 7AM - Saturday, September 30th at 7PM

WHY

The contractor is working on a wastewater tunneling project that is located close to the existing lanes and the existing lanes are cracked, broken and ponding with water due the heavy construction therefore creating a safety hazard for drivers.

CONTACT

Houston 3-1-1 (713.837.0311) reference Project No. N-000590-0001-4

Share Lane Closure- Holmes Road on Facebook Share Lane Closure- Holmes Road on Twitter Share Lane Closure- Holmes Road on Linkedin Email Lane Closure- Holmes Road link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>