PROJECT NUMBER R-000536-0026

LOCATION Refer to project map

COUNCIL DISTRICT G

BUDGET $19,677,850

TYPE Wastewater

START Spring 2021

COMPLETION Spring 2024

DETAILS The project provides for the installation of new wastewater system lines and the abandonment of two lift stations. This project also provides the diversion of flow from the previous wastewater lines to the new wastewater lines.


MAP

project map



What is the purpose of this project?
The purpose of this project is to install a wastewater system ( ranging in size from *-inch to 18-inch) on Bering Drive, divert wastewater flows with 30-inch to 48-inch gravity lines on San Felipe Drive and Fountain View Drive, and decommission two Lift Stations.
How long is this project going to take to complete?
Approximately 25 months (765 calendar days). Work is scheduled to begin in Spring 2021 and is anticipated to be completed in Winter 2024. The project schedule depends upon weather conditions.


Have More Questions? Click here for more answers.

PROJECT NUMBER R-000536-0026

LOCATION Refer to project map

COUNCIL DISTRICT G

BUDGET $19,677,850

TYPE Wastewater

START Spring 2021

COMPLETION Spring 2024

DETAILS The project provides for the installation of new wastewater system lines and the abandonment of two lift stations. This project also provides the diversion of flow from the previous wastewater lines to the new wastewater lines.


MAP

project map



What is the purpose of this project?
The purpose of this project is to install a wastewater system ( ranging in size from *-inch to 18-inch) on Bering Drive, divert wastewater flows with 30-inch to 48-inch gravity lines on San Felipe Drive and Fountain View Drive, and decommission two Lift Stations.
How long is this project going to take to complete?
Approximately 25 months (765 calendar days). Work is scheduled to begin in Spring 2021 and is anticipated to be completed in Winter 2024. The project schedule depends upon weather conditions.


Have More Questions? Click here for more answers.

  • Latest News

    Share Latest News on Facebook Share Latest News on Twitter Share Latest News on Linkedin Email Latest News link

    We anticipate that the remaining work will extend for another eight to ten weeks, putting the estimated completion timeframe around mid-June or Spring 2024. The delay primarily stems from the testing protocols required for the reinstalled sections of the pipeline. As per these testing guidelines, the Contractor must wait for a 30-day period before conducting the necessary inspections on the pipe. However, there is a silver lining as we anticipate the removal of traffic control measures along a short section of Bering (near San Felipe) by month's end.

  • Latest News

    Share Latest News on Facebook Share Latest News on Twitter Share Latest News on Linkedin Email Latest News link

    The Contractor for this project states: The work along San Felipe St. is complete. The work along Fountain View Drive is complete. The work along Bering Drive is expected to take another six to seven weeks with an estimated completion timeline of early April (Spring 2024). During this time, the newly installed piping system will undergo testing and constituents can expect to see traffic control measures removed near the intersection of Bering and San Felipe in the coming weeks.

Page last updated: 25 Mar 2024, 04:37 PM