Kirkwood Paving and Drainage - Subproject 2

Share Kirkwood Paving and Drainage - Subproject 2 on Facebook Share Kirkwood Paving and Drainage - Subproject 2 on Twitter Share Kirkwood Paving and Drainage - Subproject 2 on Linkedin Email Kirkwood Paving and Drainage - Subproject 2 link

PROJECT NUMBER N-100029-0002

LOCATION Refer to map

COUNCIL DISTRICT G

BUDGET $25,410,000

TYPE Street

START Summer 2023

COMPLETION Spring 2025

DETAILS The work includes new concrete and asphalt pavement, curbs, wheelchair ramps, sidewalks, streetlights, and reconstruction of median openings. The existing drainage system will be upgraded with the installation of new storm sewers, inlets, manholes, and inline detention. The existing water main will be replaced to include new fire hydrants and valves.


MAP

Project Map


General Project Information

What is the purpose of this project?

This project is a part of the Street and Traffic Capital Improvement project and is necessary to improve roadway and traffic mobility and to meet City of Houston Design Standards.


How long is the project going to take?
Work began in Summer 2023 and is anticipated to be completed in Spring 2025. The project schedule depends upon weather conditions.


Have More Questions? Click here for more answers

PROJECT NUMBER N-100029-0002

LOCATION Refer to map

COUNCIL DISTRICT G

BUDGET $25,410,000

TYPE Street

START Summer 2023

COMPLETION Spring 2025

DETAILS The work includes new concrete and asphalt pavement, curbs, wheelchair ramps, sidewalks, streetlights, and reconstruction of median openings. The existing drainage system will be upgraded with the installation of new storm sewers, inlets, manholes, and inline detention. The existing water main will be replaced to include new fire hydrants and valves.


MAP

Project Map


General Project Information

What is the purpose of this project?

This project is a part of the Street and Traffic Capital Improvement project and is necessary to improve roadway and traffic mobility and to meet City of Houston Design Standards.


How long is the project going to take?
Work began in Summer 2023 and is anticipated to be completed in Spring 2025. The project schedule depends upon weather conditions.


Have More Questions? Click here for more answers

Frequently Asked Questions

GENERAL PROJECT INFORMATION

Q What is the purpose of this project?
This Project provides for the design and reconstruction of Kirkwood Roadway with curbs, sidewalks, driveways, street lighting, traffic control, and necessary underground utilities, along with in-line detention. This project includes two (2) sub-projects. 


Q What is going to be replaced/installed in this project?
Streets, curbs, sidewalks, driveways, street lighting, traffic control, and water and sewer underground utilities along with in-line detention. 



Q How long is this project going to take to complete?
A (815 days) Work is scheduled to begin in the Spring of 2023 and is anticipated to be completed in the Summer of 2025. The project schedule will depend on weather conditions.


SIDEWALKS, TREES & LIGHTING

Q Will there be Street Light Poles installed?
A Yes.

Q What are my options if I do not want to construct a sidewalk with my project?

A If the sidewalks are designed and to be reconstructed and fall within the City of Houston right away, they will be reconstructed.




CONSTRUCTION

Q At some point, will my utilities be affected?
Yes, at some point, utilities will be affected. However, you always have water and use of other utilities. 



Q Will this project cause traffic/mobility issues (lane closures, increase of trucks in the area, etc.)?
A Yes, however, the traffic control plans will be readily available. There will always be an egress and regress. No Business driveways will be blocked.



Q Are they going to dig up the front area or just the street?
A Yes, street and front areas will be excavated.



Q When will my services be transferred to the new line?

A Once the new line is fully installed and pressured tested for leaks. Then the City of Houston will come and chlorinate and disinfect the water main lines for safe drinking water. Once that passes, the service line will be transferred to the new line.




CONTACT INFORMATION

NON-EMERGENCY NEEDS
Dial 311 - Mention to the operator the following 3 things along with your issue:
- Project number: N-100029-0002
- Kirkwood Paving and Drainage - Subproject 2
- Refer the questions/comments to Capital Projects

EMERGENCY NEEDS
Contact the Contractor or the 24-hour contact provided by the contractor.

Contractor
Main Lane Industries, LTD.
Bobby Vasek– Project Manager 713.400.2755

Houston Public Works
Charles Jones– Project Manager 832.395.2348


HELPFUL LINKS

PROJECT SPECIFIC CONCERNS
Engage@houstontx.gov

GENERAL CONCERNS
3-1-1 or 713.837.0311
www.houston311.org

You need to be signed in to comment in this Guest Book. Click here to Sign In or Register to get involved

Rounded corners so drivers don't have to slow down for right turns are TERRIBLE. First, encourages drivers to not come to a complete stop for a right turn on red. Second, terrible for ped/bike users. Drivers look left as they turn right * without completely stopping or yielding * for people crossing the street. This is not multimodal design. Please change this.

Kevin 8 months ago

I am unable to find the details of the Waldemar intersection in the documents. The details of this intersection are important for bicycle transportation because Waldemar is a neighborhood shared street bike route. I would like to see the planned details for the intersection since the bike route will continue to cross Kirkwood, and the movements from/onto Waldemar on the west side are changing from existing. With the design I can go to the intersection and understand any possible sight line/traffic conflict issue. Thank you.

bryandotson 8 months ago

I appreciate that you're replacing the unsafe bike gutters with a protected shared-use path. I would like to see the travel lanes reduced to 10', instead of 11' as proposed. According to NACTO, "Lane widths of 10 feet are appropriate in urban areas and have a positive impact on a street’s safety without impacting traffic operations." The extra 4' of width could be used to replace the 6' sidewalk on the west side with a second 10' shared-use path, which would allow bicycles to use both sides of the street.

NealEhardt 9 months ago
Page last updated: 27 Mar 2024, 02:58 PM