GENERAL PROJECT INFORMATION
Q What is the purpose of this project?
COH partnership project consists of the Mill & Overlay of 4,281 LF of roadway, including base and subgrade repair as identified by the EOR, and approximately 500 -LF of new 6-ft sidewalk between the driveways of YES Prep schools on the north side of Crenshaw Road. The scope also includes pavement markings, ditch regrading along both sides of the road, and reconstruction of 9 driveways in concrete.
Q When is the construction start date?
Early start June 2023/Late Start July 2023
Q What is the project duration?
Q What are the project limits?
South Shaver Road to Allen Genoa
Q Where is the project located?
Houston, TX
Q What is the construction cost of the project?
Anticipated $800K
Q Name of schools in the area?
YesPrep Public Schools
Q What is the Precinct contribution towards this project?
County to provide engineering services to produce PS&E, obtain permits, manage and inspect the construction.
Q Who will be the point of contact regarding construction-related issues?
- Ashwaq Alhammami
- Email: Ashwaq.alhammami@harriscountytx.gov
Q Have we had a community engagement?
COH will lead this effort prior to the start date of construction
Q What is the COH contribution towards this project?
COH Contribution will be the anticipated cost of (design and construction, cmt, cps).
Q Will there be sidewalks on this project?
Yes. Connectivity to connect the 2 schools is approximately 500 LF.
Q Why not the entire roadway?
- Survey will be needed
- Trees will need to be removed
- Utilities will need to be relocated
- The newly installed drainage will be impacted, and storm sewer will need to be installed the length of the roadway
Q Will the drainage be improved?
Ditch regrading will be performed to improve the drainage and there will be a few culvert replacements per the EOR assessment.
Q What is the name of the contractor?
Hayden Paving – Precinct 2 On-Call Contractor.
Q What is the name of the engineer of record?
CONCERNS:
Q Will this project cause traffic/mobility issues (lane closures, increase of trucks in the area, etc.)?
Traffic control best practices will be implemented to regulate flow of traffic, and possibly one lane closure for a short period of time (1 day or 2).
Q What are possible negative effects on residents?
Rough road surface for a short period of time, and slow movement of traffic
Q Will this project cause a disruption in services of any kind?
No
Q What hours will the crews work?
Between 7am – 5pm (standard)
Q Will work continue on the weekends?
No work on weekends
CONTACT INFORMATION
NON-EMERGENCY NEEDS
Dial 311 - Mention to the operator the following 3 things along with your issue:
- Project number: N-1000037-0001
- Crenshaw Road from South Shaver Street to Allen Genoa Road Reconstruction
- Refer the questions/comments to Capital Projects
EMERGENCY NEEDS
Contact Contractor or the 24-hour contact provided by the contractor.
CONTRACTOR
Ashwaq Alhammami – Email: Ashwaq.alhammami@harriscountytx.gov
HELPFUL LINKS
PROJECT SPECIFIC CONCERNS
Buildforward@houstontx.gov
GENERAL CONCERNS
3-1-1 or 713.837.0311
www.houston311.org