TIRZ 17 Memorial City Area Detention Basin

Share TIRZ 17 Memorial City Area Detention Basin on Facebook Share TIRZ 17 Memorial City Area Detention Basin on Twitter Share TIRZ 17 Memorial City Area Detention Basin on Linkedin Email TIRZ 17 Memorial City Area Detention Basin link
BOONE AND HACKBERRY

Project Overview

Council District: G

Project Number: M-430296-0017

Estimated Budget: $75,000,000

Start: Winter 2027

Completion: Summer 2028





Project Impact Area




Community Feedback

Have questions or feedback about this project? Email us at engage@houstontx.gov or call 311.


Project Overview

Council District: G

Project Number: M-430296-0017

Estimated Budget: $75,000,000

Start: Winter 2027

Completion: Summer 2028





Project Impact Area




Community Feedback

Have questions or feedback about this project? Email us at engage@houstontx.gov or call 311.


What’s your question for the project team?

Email
loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
  • Share Retention ponds have traditional issues from algae which forms long thick arms which combined with sediment reduces flow through pipes Plus all things structural or mechanical break This puts Fonn villas and memorial meadows at new risk for flooding We do not want this at all No one wants this here No one even heard about it until recently. on Facebook Share Retention ponds have traditional issues from algae which forms long thick arms which combined with sediment reduces flow through pipes Plus all things structural or mechanical break This puts Fonn villas and memorial meadows at new risk for flooding We do not want this at all No one wants this here No one even heard about it until recently. on Twitter Share Retention ponds have traditional issues from algae which forms long thick arms which combined with sediment reduces flow through pipes Plus all things structural or mechanical break This puts Fonn villas and memorial meadows at new risk for flooding We do not want this at all No one wants this here No one even heard about it until recently. on Linkedin Email Retention ponds have traditional issues from algae which forms long thick arms which combined with sediment reduces flow through pipes Plus all things structural or mechanical break This puts Fonn villas and memorial meadows at new risk for flooding We do not want this at all No one wants this here No one even heard about it until recently. link

    Retention ponds have traditional issues from algae which forms long thick arms which combined with sediment reduces flow through pipes Plus all things structural or mechanical break This puts Fonn villas and memorial meadows at new risk for flooding We do not want this at all No one wants this here No one even heard about it until recently.

    Donna asked 7 days ago

    Ready...Set...ENGAGE!

    Thank you for sharing your concerns regarding the TIRZ 17 Memorial City Area Detention Basin Project. Protecting surrounding neighborhoods, including Fonn Villas and Memorial Meadows, is a top priority, and this project is specifically designed to help reduce flood risk in the area.

    The proposed detention basin will be located underground and includes several features to help prevent sediment buildup and maintenance issues. A pretreatment chamber will capture and trap dirt and debris before stormwater enters the main storage area, helping the system operate efficiently. The facility will also include an access lid so maintenance crews and equipment can safely perform routine inspections and cleanout.

    The City of Houston will conduct regular maintenance at appropriate intervals, including the use of vacuum trucks to remove accumulated sediment and ensure the system continues to function as designed.

    The basin is engineered to temporarily store stormwater runoff and release it gradually, reducing peak flows during heavy rainfall events and lowering the risk of flooding for nearby communities.

    We appreciate community feedback and remain committed to keeping residents informed as the project progresses.

  • Share Please change this to under mms as this would severely disrupt our neighborhood and widening of Vinson st would help the neighborhood rather than widening a dead end st Kingsride on Facebook Share Please change this to under mms as this would severely disrupt our neighborhood and widening of Vinson st would help the neighborhood rather than widening a dead end st Kingsride on Twitter Share Please change this to under mms as this would severely disrupt our neighborhood and widening of Vinson st would help the neighborhood rather than widening a dead end st Kingsride on Linkedin Email Please change this to under mms as this would severely disrupt our neighborhood and widening of Vinson st would help the neighborhood rather than widening a dead end st Kingsride link

    Please change this to under mms as this would severely disrupt our neighborhood and widening of Vinson st would help the neighborhood rather than widening a dead end st Kingsride

    Donna W asked 21 days ago

    Ready…Set…ENGAGE!


    Thank you for staying engaged regarding the TIRZ 17 Memorial City Area Detention Basin project. Residents have requested that work impacting Kingsride be reconsidered. Widening Bidin or Vinson Street would provide greater benefit to neighborhood traffic flow than widening a dead-end street such as Kingsride.


    - The Engage Houston Team

  • Share We have 3 heritage trees on Kingsride that should not be disturbed Kingsride should not be widened as it is a dead end and is not subject to high traffic flow on Facebook Share We have 3 heritage trees on Kingsride that should not be disturbed Kingsride should not be widened as it is a dead end and is not subject to high traffic flow on Twitter Share We have 3 heritage trees on Kingsride that should not be disturbed Kingsride should not be widened as it is a dead end and is not subject to high traffic flow on Linkedin Email We have 3 heritage trees on Kingsride that should not be disturbed Kingsride should not be widened as it is a dead end and is not subject to high traffic flow link

    We have 3 heritage trees on Kingsride that should not be disturbed Kingsride should not be widened as it is a dead end and is not subject to high traffic flow

    Donna W asked 21 days ago

    Ready…Set…ENGAGE!


    Thank you for staying engaged regarding the TIRZ 17 Memorial City Area Detention Basin project. The project is seeking to limit impacts to trees within the work limits, and the current design does not include tree removal on Kingsride, except near the dead-end side by the school.


    - The Engage Houston Team

  • Share Will the city of houston be responsible for ongoing maintenance and repair as everything mechanical structural eventually breaks on Facebook Share Will the city of houston be responsible for ongoing maintenance and repair as everything mechanical structural eventually breaks on Twitter Share Will the city of houston be responsible for ongoing maintenance and repair as everything mechanical structural eventually breaks on Linkedin Email Will the city of houston be responsible for ongoing maintenance and repair as everything mechanical structural eventually breaks link

    Will the city of houston be responsible for ongoing maintenance and repair as everything mechanical structural eventually breaks

    Donna W asked 21 days ago

    Ready…Set…ENGAGE!

    Thank you for your question regarding the TIRZ 17 Memorial City Area Detention Basin project. The proposed underground detention basin will be maintained by the City of Houston.


    - The Engage Houston Team

  • Share I would like to know if there is ongoing coordination with MetroNational as their mall rebuild will be going on at the same time and traffic will be severely impacted by both of these projects. on Facebook Share I would like to know if there is ongoing coordination with MetroNational as their mall rebuild will be going on at the same time and traffic will be severely impacted by both of these projects. on Twitter Share I would like to know if there is ongoing coordination with MetroNational as their mall rebuild will be going on at the same time and traffic will be severely impacted by both of these projects. on Linkedin Email I would like to know if there is ongoing coordination with MetroNational as their mall rebuild will be going on at the same time and traffic will be severely impacted by both of these projects. link

    I would like to know if there is ongoing coordination with MetroNational as their mall rebuild will be going on at the same time and traffic will be severely impacted by both of these projects.

    22 days ago

    Ready...Set...ENGAGE!

    The City has had contact with MetroNational for this project.  The City’s designer will consider nearby construction projects for their design including any temporary traffic control detours.

    - Engage Houston Team

  • Share If we're going to suffer torn up streets, business access disrupted for whoever knows how long, we need to know the area will be better than we found it. We should improve walking and biking after the road has been resurfaced. I would like to see shared use paths instead of bare minimum sidewalks. on Facebook Share If we're going to suffer torn up streets, business access disrupted for whoever knows how long, we need to know the area will be better than we found it. We should improve walking and biking after the road has been resurfaced. I would like to see shared use paths instead of bare minimum sidewalks. on Twitter Share If we're going to suffer torn up streets, business access disrupted for whoever knows how long, we need to know the area will be better than we found it. We should improve walking and biking after the road has been resurfaced. I would like to see shared use paths instead of bare minimum sidewalks. on Linkedin Email If we're going to suffer torn up streets, business access disrupted for whoever knows how long, we need to know the area will be better than we found it. We should improve walking and biking after the road has been resurfaced. I would like to see shared use paths instead of bare minimum sidewalks. link

    If we're going to suffer torn up streets, business access disrupted for whoever knows how long, we need to know the area will be better than we found it. We should improve walking and biking after the road has been resurfaced. I would like to see shared use paths instead of bare minimum sidewalks.

    22 days ago

    Ready...Set...ENGAGE!

    Roadway reconstruction has been designed to maximize the safety and comfort for sidewalk users. This is being accomplished by offsetting the sidewalk from the roadway curb line per the City’s safety buffer requirements and includes replacement tree plantings, audible pedestrian signals and wheel chair ramps to current standards.

    - Engage Houston Team

  • Share I missed this meeting. Please send me meeting notes. on Facebook Share I missed this meeting. Please send me meeting notes. on Twitter Share I missed this meeting. Please send me meeting notes. on Linkedin Email I missed this meeting. Please send me meeting notes. link

    I missed this meeting. Please send me meeting notes.

    22 days ago

    Ready...Set...ENGAGE!

    The City will post the January 7, 2026 public meeting presentation slides on the project’s webpage:  https://www.engagehouston.org/tirz-17-memorial-area-detention-basin

    - Engage Houston Team 

  • Share Why wasn't everyone affected by this project notified of the meeting? on Facebook Share Why wasn't everyone affected by this project notified of the meeting? on Twitter Share Why wasn't everyone affected by this project notified of the meeting? on Linkedin Email Why wasn't everyone affected by this project notified of the meeting? link

    Why wasn't everyone affected by this project notified of the meeting?

    22 days ago

    Ready...Set...ENGAGE!

    The City sought to notify vicinity Superneighborhoods points of contact (https://www.houstontx.gov/superneighborhoods/) which in turn can reach a larger audience, vicinity residents and agency partners

    - Engage Houston Team