Share Traffic Closure on Facebook
Share Traffic Closure on Linkedin
Email Traffic Closure link
WHAT |
Traffic Closure at Overbrook Lane and Kirkwood |
WHEN |
February 9th to February 26th |
WHY |
To construct Water and Wastewater Lines |
WHO TO CONTACT |
Houston 311 reference Project Number N-100029-0002 |
Share Latest News on Facebook
Share Latest News on Linkedin
Email Latest News link
Completed to Date:
- The contractor has completed the wastewater system improvements and continues to install the proposed wastewater system along the project alignment.
- The contractor has commenced the installation of the 16-inch water line proposed along Kirkwood. Approximately 300 linear feet of the 3500 linear feet have been installed.
Planned Work (Next 30 Days)
- Continue installation of the wastewater system.
- Continue installation of 16-inch water line. Start testing the water line.
- The contractor anticipates the water and wastewater work will be completed in April.
Share Trees on Facebook
Share Trees on Linkedin
Email Trees link
The City understands the value and beauty of our trees and is committed to make sure we evaluate and preserve all trees within the project area when possible. However, due to the drainage, safety and mobility improvements planned for this project, some of the trees along Kirkwood Drive will be impacted and require removal. The good news is that no trees along Briar Forest will be impacted by this project.
The City does have a tree ordinance that governs the removal, mitigation and care of trees within the City’s right-of-way for construction projects. At the conclusion of this project, the Contractor will be installing new trees along the project alignment to mitigate for the removal of the existing trees per the Ordinance. The tree protection plan for this project is posted here on the project page. Please subscribe to this page to receive the latest updates as they become available.
Share Traffic Switch on Facebook
Share Traffic Switch on Linkedin
Email Traffic Switch link
WHAT |
Traffic Switch |
WHEN |
Wednesday, January 10th at 1PM-Wednesday, February 14th at 7PM |
WHY |
To construct Water and Wastewater lines |
WHO TO CONTACT |
Houston 311 reference Project Number N-100029-0002 |
Share Latest News on Facebook
Share Latest News on Linkedin
Email Latest News link
- The contractor has installed tree protection measures (including fencing) throughout the project area.
- The contractor has commenced pruning of the trees that are adjacent to the construction areas.
- The contractor has started removing trees designated for removal in the project plans.
- The water and sanitary sewer improvements will commence this month.
- There will be moving lane closures to accommodate the water and sewer work.