Westridge & Braes Terrace Street Improvements
PROJECT NUMBER M-410016-001A
LOCATION Refer to map
COUNCIL DISTRICT K
BUDGET $16,000,000
TYPE Street
CONSTRUCTION START Spring 2026 (Phase 2)
CONSTRUCTION START Spring 2028 (Phase 3)
DETAILS The project involves the removal and replacement of all curbs, gutter, and driveway aprons. In addition, all storm sewer lines within the pavement will be replaced in coordination with Stormwater Operations. New sidewalks on both sides of the streets, new streetlight system and poles, and new concrete pavement will be installed to enhance the overall infrastructure of the area. Waterlines will be replaced in coordination with drinking water operations.
MAP
General Project Information
What is the purpose of this project? The project includes replacing curb, gutter, and driveway aprons, upgrading inlets and leads, adding sidewalks on both sides of the streets, installing new streetlight systems and poles, and laying down the new concrete pavement to improve the infrastructure of the area. New waterlines will be installed to enhance water delivery service. |