TIRZ17 Memorial City Area Detention Basin

Share TIRZ17 Memorial City Area Detention Basin on Facebook Share TIRZ17 Memorial City Area Detention Basin on Twitter Share TIRZ17 Memorial City Area Detention Basin on Linkedin Email TIRZ17 Memorial City Area Detention Basin link

PROJECT NUMBER M-430296-0017

LOCATION Generally, it is bound by I-10 to the north, Vindon Dr to the south, Attingham Dr to the west, and Beningus to the east.

COUNCIL DISTRICT G

BUDGET $75,500,000

TYPE Drainage

START Fall 2025

COMPLETION Fall 2027

DETAILS The project consists of the design of a subsurface detention basin located in a Spring Branch ISD sports facility (Memorial Middle School site) and a storm sewer conveyance system from W151-00-00 beginning at Barryknoll Lane near Bettina Court, west to Gessner Road, west to the end of Kingsride Lane and connecting to the sports complex detention basin. The detention basin outfall is planned to connect to the existing storm trunkline on Attingham Drive which will outfall to the HCFCD W153-00-00 channel.


MAP


General Project Information

How is this project funded? This project is part of the Federal Emergency Management Administration's (FEMA) Hazard Mitigation Grant Program (HMGP). The Texas Division of Emergency Management (TDEM) is the recipient of HMGP funding, and the City is the sub-recipient. The funding for project costs is based on a 44.78% federal and 55.22% local cost share. The TIRZ 17 Memorial City Redevelopment Authority will provide the entirety of the local match requirement.

Current project status: The project is under design by consultant HR Green, Inc. The preliminary phase includes drainage analysis of existing and proposed conditions, 30% roadway design, and the selection of the detention site. The preliminary engineering phase is 95% complete. The findings of the preliminary design were presented to the City of Houston in a Technical Review Committee meeting on March 7, 2024. The consultant is making final updates to the Preliminary Engineering Report based on the comments received in the meeting. Final Design will include finalizing design elements, producing final construction drawings, securing necessary permits, and addressing preparation for real estate acquisition and easement documents. The design phase started in the Fall of 2022, and the anticipated completion is the Spring of 2025. Construction will be from Fall 2025 to Fall 2027.


Have More Questions? Click here for more answers

PROJECT NUMBER M-430296-0017

LOCATION Generally, it is bound by I-10 to the north, Vindon Dr to the south, Attingham Dr to the west, and Beningus to the east.

COUNCIL DISTRICT G

BUDGET $75,500,000

TYPE Drainage

START Fall 2025

COMPLETION Fall 2027

DETAILS The project consists of the design of a subsurface detention basin located in a Spring Branch ISD sports facility (Memorial Middle School site) and a storm sewer conveyance system from W151-00-00 beginning at Barryknoll Lane near Bettina Court, west to Gessner Road, west to the end of Kingsride Lane and connecting to the sports complex detention basin. The detention basin outfall is planned to connect to the existing storm trunkline on Attingham Drive which will outfall to the HCFCD W153-00-00 channel.


MAP


General Project Information

How is this project funded? This project is part of the Federal Emergency Management Administration's (FEMA) Hazard Mitigation Grant Program (HMGP). The Texas Division of Emergency Management (TDEM) is the recipient of HMGP funding, and the City is the sub-recipient. The funding for project costs is based on a 44.78% federal and 55.22% local cost share. The TIRZ 17 Memorial City Redevelopment Authority will provide the entirety of the local match requirement.

Current project status: The project is under design by consultant HR Green, Inc. The preliminary phase includes drainage analysis of existing and proposed conditions, 30% roadway design, and the selection of the detention site. The preliminary engineering phase is 95% complete. The findings of the preliminary design were presented to the City of Houston in a Technical Review Committee meeting on March 7, 2024. The consultant is making final updates to the Preliminary Engineering Report based on the comments received in the meeting. Final Design will include finalizing design elements, producing final construction drawings, securing necessary permits, and addressing preparation for real estate acquisition and easement documents. The design phase started in the Fall of 2022, and the anticipated completion is the Spring of 2025. Construction will be from Fall 2025 to Fall 2027.


Have More Questions? Click here for more answers

  • Latest News

    Share Latest News on Facebook Share Latest News on Twitter Share Latest News on Linkedin Email Latest News link

    The project is under design by a consultant at HR Green, Inc. The preliminary phase includes drainage analysis of existing and proposed conditions, 30% roadway design, and the selection of the detention site. The preliminary engineering phase is 95% complete. The findings of the preliminary design were presented to the City of Houston in a Technical Review Committee meeting on March 7, 2024. The consultant is making final updates to the Preliminary Engineering Report based on the comments received in the meeting. Final Design will include finalizing design elements, producing final construction drawings, securing necessary permits, and addressing preparation for real estate acquisition and easement documents. The design phase started in Fall 2022, and the anticipated completion is Spring 2025. Construction will be from Fall 2025 to Fall 2027.

  • Latest News

    Share Latest News on Facebook Share Latest News on Twitter Share Latest News on Linkedin Email Latest News link

    The project is under design. The design consultant is HR Green, Inc. The preliminary engineering phase will conduct various studies and perform analysis to produce a recommended project. Final Design will then follow, finalizing design elements, producing final construction drawings, necessary permits, and addressing preparation for real estate acquisition and easements. The design phase started Fall 2022, and the anticipated completion is Spring 2025. Construction will be from Fall 2025 to Fall 2027.

  • Latest News

    Share Latest News on Facebook Share Latest News on Twitter Share Latest News on Linkedin Email Latest News link

    The project is currently in the first phase of design which contains conducting several tasks including the Drainage Analysis of existing and proposed conditions and the selection of the detention site.