Antoine Drive Paving and Drainage Segment 2-US 290 to Victory Drive

Share Antoine Drive Paving and Drainage Segment 2-US 290 to Victory Drive on Facebook Share Antoine Drive Paving and Drainage Segment 2-US 290 to Victory Drive on X (formerly Twitter) Share Antoine Drive Paving and Drainage Segment 2-US 290 to Victory Drive on Linkedin Email Antoine Drive Paving and Drainage Segment 2-US 290 to Victory Drive link
Street Paving and Roadwork Crew

Project Overview

Council District: A & C

Project Number: N-100030-0003

Estimated Budget: $106,370,000

Start: Spring 2029

Completion: Spring 2034




Project Impact Area

The Antoine Drive Paving and Drainage Segment 2 project runs along Antoine Drive from US 290 to Victory Drive.

Antoine Drive Segment 2 Project Area MapMap showing the Antoine Drive Paving and Drainage Segment 2 project area along Antoine Drive from US 290 to Victory Drive.




Community Feedback

Have questions or feedback about this project? Email us at engage@houstontx.gov or call 311.

Project Overview

Council District: A & C

Project Number: N-100030-0003

Estimated Budget: $106,370,000

Start: Spring 2029

Completion: Spring 2034




Project Impact Area

The Antoine Drive Paving and Drainage Segment 2 project runs along Antoine Drive from US 290 to Victory Drive.

Antoine Drive Segment 2 Project Area MapMap showing the Antoine Drive Paving and Drainage Segment 2 project area along Antoine Drive from US 290 to Victory Drive.




Community Feedback

Have questions or feedback about this project? Email us at engage@houstontx.gov or call 311.

  • Latest News

    Share Latest News on Facebook Share Latest News on X (formerly Twitter) Share Latest News on Linkedin Email Latest News link

    We're making great progress! This project is currently in the design phase, and our team is working to develop improvements that will enhance safety, mobility, and reliability for everyone who lives, works, and travels through the area.

    The planned improvements include:

    • 🚧 Full roadway reconstruction to create four 11-foot travel lanes separated by a central median, improving traffic flow and safety.
    • 🚶 New 6-foot sidewalks on both sides of the roadway to provide safer, more accessible routes for pedestrians.
    • 🌉 Reconstruction of three existing bridges to improve long-term structural integrity and performance.
    • 🚆 Construction of a new grade separation bridge over the BNSF railroad tracks, helping reduce delays and improve connectivity.
    • 🚦 Replacement of traffic signals and installation of new street lighting to enhance visibility and promote safer travel.
    • 🌧️ Major storm sewer system upgrades, along with necessary water and wastewater line replacements, to strengthen essential infrastructure and improve drainage.

    Design is an important step in delivering a project that meets the community's current and future needs. We appreciate your patience and support as we move forward and will continue to share updates as the project reaches new milestones.

    We're making great progress! This project is currently in the design phase, and our team is working to develop improvements that will enhance safety, mobility, and reliability for everyone who lives, works, and travels through the area.

    The planned improvements include:

    • 🚧 Full roadway reconstruction to create four 11-foot travel lanes separated by a central median, improving traffic flow and safety.
    • 🚶 New 6-foot sidewalks on both sides of the roadway to provide safer, more accessible routes for pedestrians.
    • 🌉 Reconstruction of three existing bridges to improve long-term structural integrity and performance.
    • 🚆 Construction of a new grade separation bridge over the BNSF railroad tracks, helping reduce delays and improve connectivity.
    • 🚦 Replacement of traffic signals and installation of new street lighting to enhance visibility and promote safer travel.
    • 🌧️ Major storm sewer system upgrades, along with necessary water and wastewater line replacements, to strengthen essential infrastructure and improve drainage.

    Design is an important step in delivering a project that meets the community's current and future needs. We appreciate your patience and support as we move forward and will continue to share updates as the project reaches new milestones.